- 摘 要
-
(威海景英高結(jié)構(gòu)工程事務(wù)所, 威海 264209)
[摘要]通過分析場地抗浮設(shè)防水位與結(jié)構(gòu)抗浮設(shè)防水位的差異,考查影響抗浮設(shè)防水位確定的各種因素,提出合理地確定地下結(jié)構(gòu)的結(jié)構(gòu)抗浮設(shè)防水位的方法和相應的技術(shù)控制措施。通過工程案例,說明合理地確定結(jié)構(gòu)抗浮設(shè)防水位既能保證地下結(jié)構(gòu)安全,又能產(chǎn)生巨大的經(jīng)濟效益。
[關(guān)鍵詞]地下結(jié)構(gòu); 場地抗浮設(shè)防水位; 結(jié)構(gòu)抗浮設(shè)防水位; 基坑支護; 地形地貌; 降排截水措施
中圖分類號: TU318.2 文獻標識碼: A 文章編號: 1002-848X(2015)S2-0188-05
Rationally determining the structural water level for prevention of
up-floating of underground structures
Jing Yinggao, Wang Yanhong, Bai Bing, Sun Rui, Tian Shuyu
(Weihai Jingyinggao Structural Design INC., Weihai 264209, China)
Abstract: It is meant to investigate various factors which have influence on the determination of water level for prevention of up-floating by analyzing the differences between building site water level for prevention of up-floating and structural water level for prevention of up-floating, and therefore, to advance reasonable methods to determine structural water level for prevention of up-floating of the underground structure and corresponding technical control measures. Also, it is well explained, through the engineering cases, that a reasonable determination of the structural water level for prevention of up-floating can not only ensure the safety of the underground structure but also bring enormous economic benefit.
Keywords: underground structure; building site water level for prevention of up-floating; structural water level for prevention of up-floating; retaining and protection for excavations; reconstruction of terrain and landforms; groundwater control
作者簡介:景英高,碩士,高級工程師,一級注冊結(jié)構(gòu)工程師,注冊土木工程師(巖土),Email:jg3000@126.com。