- 摘 要
-
(華南理工大學(xué)建筑設(shè)計(jì)研究院有限公司, 廣州 510641)
[摘要]清遠(yuǎn)市科技館與青少年活動中心A單元結(jié)構(gòu)設(shè)計(jì)中,通過采用鋼桁架和無粘結(jié)預(yù)應(yīng)力樓板解決了建筑功能對大跨、大空間的要求。并根據(jù)施工仿真,分析了結(jié)構(gòu)各階段的受力情況,確保了該方案的全過程可行性。最后,對大跨度區(qū)域進(jìn)行了舒適度分析,驗(yàn)證得知樓板豎向振動加速度峰值可滿足規(guī)范要求。
[關(guān)鍵詞]鋼桁架; 無粘結(jié)預(yù)應(yīng)力; 施工仿真; 舒適度
中圖分類號:TU318文獻(xiàn)標(biāo)識碼:A文章編號:1002-848X(2019)20-0075-05
Structural design of part A of Qingyuan Science and Technology Museum and Youth Activity Center
Zhou Yingbin, Chen Xiaofeng
(Architectural Design & Research Institute of SCUT Co., Ltd., Guangzhou 510641, China)
Abstract:In the structural design of part A of Qingyuan Science and Technology Museum and Youth Activity Center, steel truss and unbonded prestressed slab were applied to meet the architects′ requirements of large span and wide space. In addition, according to the construction simulation, the stress of the structure of each stage was analyzed, which ensured the feasibility of the whole process of the scheme. Finally, the comfort degree of the large-span area was analyzed, and it was verified that the peak value of vertical vibration acceleration of the floor could meet the requirements of the code.
Keywords:steel truss; unbonded prestress; construction simulation; comfort degree
作者簡介:周穎彬,碩士,一級注冊結(jié)構(gòu)工程師,Email: zhouyingbin_2012@163.com。
- 下載地址
-