- 摘 要
-
鐘玉柏1,2, 馬臣杰1, 尚文紅1, 張良平1, 趙 宏2
(1 深圳華森建筑與工程設(shè)計(jì)顧問有限公司,深圳 518054;2 深圳奧雅納工程咨詢有限公司,深圳518026)[摘要] 對某大跨度連橋結(jié)構(gòu)進(jìn)行了撓度設(shè)計(jì)和振動控制設(shè)計(jì);并對其采用的橡膠隔震支座進(jìn)行了多遇地震作用下的彈性時程分析,罕遇地震作用下的彈塑性時程分析,評估了在多遇地震作用下和罕遇作用地震下,連橋結(jié)構(gòu)以及橡膠支座的性能,根據(jù)分析結(jié)果并結(jié)合規(guī)范確定了防震縫的間距。
[關(guān)鍵詞] 連橋;橡膠支座;隔震
中圖分類號:TU276.4 文獻(xiàn)標(biāo)識碼:A 文章編號:1002-848X(2011) Sl-0208-03Analysis on large span footbridges and isolation rubber bearing of structure
Zhong Yubai1,2, Ma Chenjie1, Shang Wenhong1, Zhang Liangping1, Zhao Hong2
(1 Huasen Architecture &Engineering Design Consultants Ltd., Shenzhen 518054, China; 2 Ove Arup&Partners Ltd. Shenzhen Branch, Shenzhen 518048, China)Abstract: For two large span footbridges, which supported by rubber bearings in both ends, we analysis and check the defections and vibration in the design first. And then run elastic time history analysis in seisnuc level l, and run elastic-plastic nonlinear time history analysis in seismic level 3,to estimate the performance of rubber bearings and footMdges. Finally, make sure the smallest width of seismic meets between the footbridge and towers.
Keywords: footMdge; rubber bearing; seismic isolation
- 下載地址
-