- 摘 要
-
張 帆
(宏立工程顧問有限公司,福州 350001)[摘要] 最近的二十年里,香港的高層建筑中采用后張有粘結(jié)預(yù)應(yīng)力技術(shù)的轉(zhuǎn)換層厚板有了迅速的增長。由于各種實際條件的限制,要求轉(zhuǎn)換層厚板的設(shè)計必須滿足分層澆搗、分段張拉的施工工藝。本文立足于大量的實際工程經(jīng)驗,力圖勾畫出這種特殊的組合型結(jié)構(gòu)在香港現(xiàn)今的設(shè)計概貌。
[關(guān)鍵詞] 后張預(yù)應(yīng)力;轉(zhuǎn)換板;施工階段;組合結(jié)構(gòu);第三類構(gòu)件;分層澆搗;分段張拉
中圖分類號:TU378.5 文獻標(biāo)識碼:A 文章編號:1002 -848X( 2011) Sl -0622 -05Design of post-tensioned transfer plates in HongKong
Zhang Fan
( Hongli Engineering Ltd., Fuzhou 350001, China)Abstract: The use of post-tensioned transfer plate in high-rise buildings in Hong Kong has been growing rapidly in the past two decades. It is now widely accepted by developers and structural engineers. Most transfer plates are poured in two or more layers, with a horizontal joint between, to suit site conditions and construction requirements. The goal of the article is to highlight the key issues of the design works based on many actual projects.
Keywords: post-tensioning; transfer plates; construction stages; composite structures;class 3 members; pour layers and stage stressing