- 摘 要
-
練賢榮, 曹偉良, 張良平, 項 兵
(深圳華森建筑設(shè)計顧問有限公司,深圳 518054)[摘要] 在施工模擬設(shè)計基礎(chǔ)上,從施工加載時間及順序方面,詳細介紹了京基金融中心關(guān)鍵部位的施工順序及注意要點,對同類工程具有借鑒作用。
[關(guān)鍵詞] 施工階段;施工模擬;合攏
中圖分類號:TU973 文獻標識碼:A 文章編號:1002-848X(2011) Sl-0700-03Key parts of Kingkey Financial Center and main points of the construction sequence
Lian Xianrong, Cao Weiliang, Zhang Liangping, Xiang Bing
( Huasen Architecture & Engineering Design Consultants Ltd., Shenzhen 518054, China)Abstract: Based on the design of construction simulation, the details of key parts of Kingkey Financial Center and main points of the construction sequence were discussed through load time and order from the construction. The results can provide reference for sinular projects.
Keywords: construction phase; construction simulation; close